Basement Level 2 staff facilities and building-services CGI
35 Lincoln’s Inn Fields · Level B2

B2Cycle, Staff Facilities & Major Plant

Cycle storage · Staff welfare · Major building services

Basement Level 2 combines cycle and staff-welfare facilities with the building’s principal mechanical, electrical and fire-protection plant.

B2
Explore level
Scroll to discover
01

Level overview

A non-public operational level supporting active travel, staff wellbeing and resilient building services.

Cycle storage and welfare spaces sit alongside the Hub’s main plant, switchrooms, tanks and life-safety infrastructure.

Cycle store

Secure active-travel storage.

Staff welfare

Staff room, locker room and shower lobby.

Accessible facilities

Accessible shower/WC and Changing Places toilet/shower.

Health and care rooms

Lactation room and first-aid room.

Electrical infrastructure

Main equipment room, main LV and life-safety LV switchrooms.

Mechanical and public-health plant

AHU and public-health plant rooms.

Fire protection

Sprinkler tanks and sprinkler pump room.

Service infrastructure

Attenuation tank, diesel tank, security racks, storage and service corridors.

Basement Level 1 is not shown as a separate mapped page in the supplied archive. The schedule identifies only the UK Power Networks electrical room, access lobby, low-level forecourt store and associated external/service access.

02

Detailed schedule

Room names and functions are aligned to the supplied general-arrangement information.

01

Active travel

The cycle store is supported by lockers, changing and shower facilities.

02

Staff welfare

Staff room, unisex WC, lactation and first-aid accommodation support daily use.

03

Inclusive provision

Accessible shower/WC and a Changing Places toilet and shower are included.

04

Major plant

AHU, public-health and main equipment rooms carry the building’s principal services.

05

Electrical and fire systems

Main LV, life-safety LV, sprinkler tanks and the sprinkler pump room provide resilience.

06

Operations and servicing

Catering support, cleaner’s store, general storage, security racks, lift lobbies and service corridors complete the level.

CycleActive-travel facilities
M&EPrincipal building plant
FireSprinkler and life-safety systems
03

Explore the plan

Numbered markers are positioned over the corresponding labeled spaces on the supplied plan.

Basement Level 2 general-arrangement floor plan

Built for comfort. Designed for impact.

Across every level, the Hub combines passive design, high-performance systems, wellbeing-led spaces and a long-term low-carbon ambition.

Passivhaus designBREEAM OutstandingWELL PlatinumNet-zero carbon ambition
Next level · G

Agora, Reception & Café
Continue the journey

Explore next page

Interactive plan viewer

Enlarged floor plan

Magazine board

Full magazine board