Level 8 plant and maintenance CGI
35 Lincoln’s Inn Fields · Level 08

08Plant & Maintenance

Plant · Refrigeration · Maintenance

Level 8 is a non-public operational level containing plant, refrigeration and mechanical equipment with protected access for inspection and maintenance.

08
Explore level
Scroll to discover
01

Level overview

Plant and maintenance accommodation linked to the upper atrium and terrace interfaces.

Mechanical equipment, insulated plinths and access gantries are organised for safe long-term operation.

Plant room

Room 8.01 at the west side of the level.

Refrigeration and mechanical equipment

RAC and associated mechanical units.

Insulated equipment plinths

Dedicated bases for rooftop equipment.

Maintenance gantry

Protected access above the equipment zone.

Lift and stair access

Operational vertical circulation.

Atrium and terrace interfaces

Open atrium relationship and terrace outlines below.

02

Detailed schedule

Room names and functions are aligned to the supplied general-arrangement information.

01

Plant operation

The plant room houses core mechanical infrastructure.

02

Refrigeration equipment

RAC units and associated equipment serve the building.

03

Equipment support

Insulated plinths separate and support mechanical installations.

04

Maintenance access

The gantry provides safe routes for inspection and servicing.

05

Vertical access

Lifts and stairs connect the level to the building’s service routes.

06

Upper-level interfaces

The plan records the open atrium and terrace relationships below.

Non-publicOperational level
PlantMechanical equipment
GantryMaintenance access
03

Explore the plan

Numbered markers are positioned over the corresponding labeled spaces on the supplied plan.

Level 8 general-arrangement floor plan

Built for comfort. Designed for impact.

Across every level, the Hub combines passive design, high-performance systems, wellbeing-led spaces and a long-term low-carbon ambition.

Passivhaus designBREEAM OutstandingWELL PlatinumNet-zero carbon ambition
Next level · RF

Energy & Building Services
Continue the journey

Explore next page

Interactive plan viewer

Enlarged floor plan

Magazine board

Full magazine board